Trouble seeing the images? Right click on images and open in new tab to enlarge or zoom in on the page (Ctrl + mousewheel).
Note: This article has been superseded by Understanding Queue and Thread Settings in WebReports, which provides updated information covering all Queue and Thread configuration settings.
This article is being retained temporarily for compatibility with existing documentation references.
In this article we provide information on changing the "Scheduler Parallel Threads" setting for reports in WebReports.
Where to Adjust the Scheduler Parallel Threads Setting?
The "Scheduler Parallel Threads" setting is located in the Configuration page of the Management section in WebReports.
Why Use Scheduler Parallel Threads?
The "Scheduler Parallel Threads" setting will set the maximum number of threads the scheduler is allowed to use simultaneously when processing multiple reports. Controlling the number of threads helps manage how many reports can be processed in parallel, ensuring efficient use of system resources and preventing overload.
Steps to Use / Adjust Scheduler Parallel Threads.
1. Log in to WebReports with an account that has permission to modify the WebReports configuration.
2. Click on Management, then Configuration.
3. Adjust the "Scheduler Parallel Threads" setting as needed.
Comments
0 comments
Article is closed for comments.